Installation

  • 1. Elastic sublayer

    1. Elastic sublayer

    The basis consists of a prefabricated elastic sublayer. This pad is bonded to the subfloor using a solvent-free adhesive.

    1. Elastic sublayer
  • 2. Sealing

    2. Sealing

    The purpose of the first of three synthetic layers moulded onto the elastic sublayer is to create a seal.

    2. Sealing
  • 3. Base layer

    3. Base layer

    The second layer is applied thinly, as a final preparation of the floor for the installation of the thicker self-levelling layer that provides mechanical strength to the floor. This moulded synthetic layer provides a solid base and proper fit with walls and floor facilities.

    3. Base layer
  • 4. Moulded top layer

    4. Moulded top layer

    On top of the base layer, using the same high-quality material and a colour that matches the final colour of the floor, a top layer is applied, which gives the floor its mechanical strength. During this operation, the material is actually moulded and distributed with special tools. The self-levelling nature of the material creates the famous seamless Pulastic top layer.

    4. Moulded top layer
  • 5. Finishing

    5. Finishing

    Pulastic sports floors derive their very high wear resistance and matt finish from the final water-based sports floor coating. This coating is available in a wide range of classic colours, design colours and bespoke colours. The Pulastic sports floor coating is considered the state of the art worldwide.

    5. Finishing
  • 6. Line marking and logos

    6. Line marking and logos

    The finishing touch for every sports floor is the line marking, applied by our line marking specialists. At this stage, any logos may also be applied.

    6. Line marking and logos
  • Finished sports floor

    Finished sports floor

    Finished sports floor